August 2019 at Photon Energy

In August, our power plant portfolio generated a total of 5.3GWh of electricity, which was 1.5% above the energy forecasts. InHungary and Australia, we continued construction works on a totalof 14.6 MWp of power plants, out of which 12.6 MWp in the Hungarianmarket are expected to be grid-connected before the end of2019.

On 22 August, Photon Energy Operations HU Kft, our HungarianO&M subsidiary, signed an operations and maintenance agreementfor a total of 6.2 MWp, strengthening our position in Hungary asthe second most important O&M market after the CzechRepublic.

On 30 August, we sold our 25% stake in Gunnedah Solar Farm PtyLtd, which marks the second successful exit from a utility scaledevelopment project in Australia. 

Download the monthly report here (pdf).

All our reports can be found onthe Reports page in our InvestorRelations section.

MEDIA CONTACT

Martin Kysly
T +420 774 810 670
martin.kysly@photonenergy.com

Používáním těchto stránek souhlasíte s užitím souborů cookies.

Rozumím

Join our Newsletter

The copy needed. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean euismod.

Amdgkas dkagd kaghd…

This site is protected by reCAPTCHA and the Google
Privacy Policy andTerms of Service apply.